During the course of engineering works in the vicinity of high-voltage overhead power lines (OHPL), an employee suffered fatal injuries when the MEWP he was operating came into contact with 11kV OHPL. The HSE alleged that the defendant had failed to adequately plan the work and had operated to flawed systems of work. The defendant was a sub-contractor of BT Openreach and maintained that in following BT proscribed procedures, it had done all that was reasonably practicable to avoid exposure to danger.

Jim was instructed by Danny McShee and Olivia Tusler of Kennedys Law LLP.

News 23/07/2025

Authors / Speakers

James Buchanan

Call 1993

Related Expertise

Popular news

R v Broughton Clarifying Causation in Gross Negligence Manslaughter

SUMMARY In 2017 a 24-year-old woman, Louella Fletcher Michie, died at the Bestival Music Festival,…

Nneka Akudolu prosecutes Kadian Nelson for offences of rape and kidnap of a 13 year old girl

On the 3rd November 2020, Kadian Nelson abducted and raped a 13 year old girl…

Portfolio Builder

Select the practice areas that you would like to download or add to the portfolio

Download    Add to portfolio   
Portfolio
Title Type CV Email

Remove All

Download


Click here to share this shortlist.
(It will expire after 30 days.)